How Much Can an Automated Knitting Machine Produce per Day?

Views: 1     Author: Site Editor     Publish Time: 2026-10-21      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Knitting capacity is the number every knitwear buyer needs before signing a purchase order, yet it usually arrives as a catalogue maximum speed or a daily figure that quietly assumes a perfect shift. When that figure meets real yarn and real style changes, delivery dates slip and yarn is over-ordered.

A computerized flat knitting machine typically produces 30 to 50 standard sweaters in 24 hours, while an automated circular knitting machine with a 30 to 34 inch cylinder produces roughly 250 to 600 kg of single jersey fabric per day. Simple styles on well-configured machines can exceed 100 flat-knit pieces or 1,000 kg of fabric, and shaped seamless garments fall to 25 to 80 pieces per machine per day, so the honest answer is a range set by machine type, gauge, stitch density and measured efficiency rather than a single headline number.

The sections below break that range down by machine type, then show how to calculate it for your own equipment.

automated knitting machines.jpg

What Counts as an Automated Knitting Machine?

Yes, fully automatic knitting machines exist and have been the industrial standard for decades. A knitting machine is any device that produces knitted fabric in a semi or fully automated fashion, so the real distinction today is mechanical patterning versus electronic needle selection.

A truly automated machine selects needles from a stored program, feeds and changes yarn, controls take-down tension and stops itself on fault. Machines that only motorise the carriage but still rely on punch cards are semi-automatic, and they behave differently on a production floor.

Flat Bed Machines

Flat machines hold needles in straight beds and form fabric as a carriage travels back and forth, so cycle time depends on working width and reversal count rather than continuous rotation. Computerized models run at roughly 0.8 to 1.6 metres per second, and because single needles can be held or transferred, one machine can knit a shaped panel or a complete garment with almost no cutting.

Circular Machines

Circular machines arrange needles in a cylinder, sometimes with a second set in a dial, and rotate the cam system continuously. Encyclopaedia Britannica notes that large modern machines may carry close to 100 feeders, letting each needle pick up a thread almost 100 times per revolution. Output scales with diameter and feeder count, which is why a circular machine can outperform a flat machine three to five times on plain fabric.

Seamless and Sock Machines

Seamless machines knit a finished-shaped garment in one piece, combining rotary knitting with reciprocating motion for shaped areas. Sock machines apply the same principle at a smaller diameter. Both are measured in pieces per shift, because machine time per piece is fixed by the style.

Daily Output by Machine Type: Reference Figures

Figures cluster tightly once machines are grouped by type and gauge. Hand flat machines deliver 5 to 8 sweaters per day, mechanical punch-card machines 10 to 15, computerized flat machines 30 to 50, and circular machines 250 to 600 kg of single jersey, with wide variation at the edges of each band.

The table assumes a 24-hour day, a mid-gauge product, stable yarn supply and efficiency of 80 to 85 percent.

Machine type

Output unit

Typical daily output

Main drivers

Hand flat bed

Sweaters

5 to 8

Operator speed, style complexity

Mechanical flat bed

Sweaters

10 to 15

Punch card changes, carriage speed

Computerized flat bed, 7G to 12G

Sweaters

30 to 50

Gauge, systems, rows per panel

Simple flat-knit styles

Pieces

80 to 150

Fewer rows, coarse gauge, wide bed

Circular single jersey, 30 to 34 inch

Kilograms

250 to 600

Diameter, feeders, RPM, yarn count

Circular double jersey or rib

Kilograms

100 to 250

Two needle beds, heavier structure

Seamless garment

Pieces

25 to 80

Shaping time, garment size, feeders

Sock machine

Pairs

120 to 250

Needle count, terry, jacquard

Flat Machines in Pieces per Day

The gap between a hand flat and a computerized flat is five to seven times, driven by carriage speed, near-instant pattern change and panels that need no cutting. Within the computerized category, most of the 30 to 50 spread is gauge: a 3G chunky style may need a few hundred rows per panel, while a 14G style can exceed a thousand.

Circular Machines in Kilograms per Day

A tube has no fixed length until it is cut, so fabric is sold by weight. A 30-inch single jersey machine with 90 feeders at around 30 RPM and 85 percent efficiency lands between 300 and 450 kg. Raise the diameter to 34 inches with 102 feeders and the same technology passes 550 kg.

Seamless and Sock Machines

Seamless output looks low in absolute terms and misleads for that reason. A shaped legging may occupy a machine for 15 to 40 minutes, so one unit yields only 25 to 80 finished pieces a day, yet each piece leaves close to finished, with no cutting room and far less sewing labour.

Circular-Knitting-Machine_602_451_591_332.png

How to Calculate Output for Your Own Machine

Two formulas cover almost every case. Flat machines are calculated by panel cycle time, dividing available minutes by the time one panel takes. Circular machines are calculated by yarn consumption, converting metres knitted per hour into kilograms using yarn count.

Both share one rule: use parameters you have measured, not the ones printed on a nameplate. A machine rated at 1.6 metres per second rarely sustains that on a fine-gauge jacquard.

The Panel Method for Flat Machines

  1. Measure the usable knitting width in metres, not the full bed width.

  2. Divide by sustained carriage speed to get one traverse in seconds.

  3. Multiply by two and add the reversal allowance, typically 0.2 to 0.4 seconds, to get row time.

  4. Multiply by rows per panel and divide by 60 for panel time in minutes.

  5. Divide available minutes multiplied by efficiency by panel time.

  6. Divide panels per day by the panel equivalents in one garment.

A 52-inch bed running a 0.40 metre width at 1.0 metre per second with a 0.3 second reversal needs about 1.1 seconds per row, so a 900-row panel takes 16.5 minutes. At 82 percent efficiency a 1,440-minute day yields about 71 panels, which at 2.8 panel equivalents per sweater becomes about 25 sweaters.

The Weight Formula for Circular Machines

Production per hour (kg) = (π × D × G × F × L × E × RPM × 60) ÷ (10 × 2.54 × 36 × 840 × Ne × 2.2046)

D is cylinder diameter in inches, G is gauge in needles per inch, F is feeders actually fitted, L is stitch length in millimetres, E is efficiency as a decimal, RPM is sustained revolutions per minute and Ne is yarn English count. Multiply by 24 for a full day, and double the denominator for double jersey and rib.

A Worked Example

Take a 34-inch, 24-gauge single jersey machine with 96 feeders, 2.6 mm stitch length, 26 sustained RPM, 0.82 efficiency and 30 Ne yarn. The numerator is 3.1416 × 34 × 24 × 96 × 2.6 × 0.82 × 26 × 60, about 818 million. The denominator is 10 × 2.54 × 36 × 840 × 30 × 2.2046, about 50.8 million. The result is 16.1 kg per hour, or roughly 387 kg per day. A longer stitch raises this figure while producing fewer metres, so kilogram and metre targets must never be mixed in one plan.

What Moves the Number Most

Gauge, knitting systems, stitch density, pattern complexity and efficiency account for nearly all variation between two machines of the same type. Systems and efficiency move the daily figure more than any single specification, because they multiply or divide the whole calculation.

Systems, Feeders and Machine Speed

A knitting system is one set of cams that can form loops during a single carriage pass. A double-system flat machine knits in both directions and delivers 1.6 to 1.9 times the output of a single-system machine of the same width; a three-system machine reaches 2.3 to 2.6 times. On circular machines the equivalent lever is feeder count, and output rises almost linearly with it.

Gauge, Yarn and Pattern Complexity

Moving from 7G to 12G roughly doubles the stitch count in the same width, cutting piece output by 30 to 50 percent even as fabric value rises. Heavier fabric works the other way for weight-based output: more yarn per course raises kilograms per hour while lowering metres. Complex intarsia and frequent colour changes can cost 20 to 35 percent against a plain style.

Variable

Direction of effect

Typical magnitude

Gauge, 7G to 12G

Lower piece output

30 to 50 percent fewer pieces

Second knitting system

Higher output

1.6 to 1.9 times

Third knitting system

Higher output

2.3 to 2.6 times

Jacquard or intarsia

Lower output

20 to 35 percent fewer pieces

Efficiency, 85 to 70 percent

Lower output

18 percent fewer pieces

Two shifts instead of three

Lower daily output

33 percent fewer pieces

Why Real Output Falls Short of the Formula

Measured output usually lands between 65 and 85 percent of the calculated figure, and published mill studies have recorded actual circular knitting production close to 68 percent of theoretical capacity. The gap is the accumulated cost of style changes, yarn breaks, needle damage, sampling and waiting.

The most common mistake is assuming 100 percent efficiency, followed by using catalogue RPM and guessing stitch length rather than measuring it. A 0.1 mm error in stitch length shifts daily kilogram output by three to four percent. Treat the formula as a ceiling and apply overall equipment effectiveness instead: a machine available 92 percent of the time, running at 88 percent of rated speed and passing 97 percent of inspection is at about 78 percent effectiveness.

WF-52CJT-800-800_665_665.webp

Turning Daily Output into Order Capacity

Divide order quantity by daily output per machine multiplied by production days and utilisation, then add allowances for sampling and rework. A 12,000-piece order due in 30 days on machines producing 40 pieces a day at 85 percent utilisation needs 12 machines, not 10.

Sampling consumes machine hours that produce no saleable output, and a 5 percent reservation is realistic on a busy floor. Rework consumes capacity twice. Seasonal peaks also mean the machine count that works in June fails in September, so plan against the peak month.

Are Knitting Machines Worth the Money?

For a factory with steady order flow, a computerized knitting machine repays its cost in roughly 12 to 24 months on conversion savings alone. For a buyer with intermittent demand the same machine is a depreciating asset, which is why utilisation decides the answer far more than purchase price.

Entry-level 52-inch double-system flat machines from established Chinese clusters commonly list between 5,000 and 15,000 US dollars, multi-system machines with full jacquard capability from 20,000 to 60,000 dollars, and whole-garment platforms above 80,000 dollars. Circular single jersey machines of 30 to 34 inches typically sit between 20,000 and 80,000 dollars.

Cost element

Basis

Approximate cost per piece

Depreciation

30,000 USD over 5 years, 12,000 pieces a year

0.50 USD

Direct labour

One operator per four machines

0.23 USD

Energy

3.5 kW average draw, 20 hours a day

0.16 USD

Needles and consumables

Annual replacement budget

0.10 USD

Maintenance

Scheduled service and spares

0.13 USD

Total conversion cost

Excluding yarn and finishing

About 1.10 USD

If in-house conversion saves two dollars per piece against an outsourced knitting charge, a 30,000 dollar machine making 12,000 pieces a year returns its cost in about 15 months. Below roughly 40 percent utilisation it never pays back. Programming skill is the hidden cost, because a machine without someone who can optimise patterns runs at a fraction of its capability.

Does Anyone Still Make Knitting Machines?

Yes, and the industry is both active and consolidated. Industrial machines are built mainly in China, Japan, Germany, Italy and Taiwan, while small domestic crank machines for craft use are still produced in volume for retail.

Chinese clusters in Jiangsu, Zhejiang and Fujian hold the largest share by unit volume and set the price floor for entry-level equipment. Japanese and German builders concentrate on whole-garment platforms, precision needle systems and pattern software, where the premium is justified by gauge consistency and resale value. Italian builders dominate seamless and large-diameter circular machines, and Taiwanese manufacturers hold a strong mid-range circular position. Lead time, parts availability and the distance to a service engineer matter as much as the specification sheet here.

What to Ask Before You Trust an Output Claim

Ask for a trial knit with your own yarn and your own stitch structure, and insist that efficiency be defined in writing. A supplier who can name the efficiency assumption behind its daily figure is usually the one whose number will hold.

Request a witnessed trial on a representative pattern, and confirm whether the quoted speed is rated maximum or sustained over an eight-hour run. Ask whether the figure includes style changeover, what the acceptance test conditions are, and which spare needles and cam components ship with the machine.

seamless.jpg

Frequently Asked Questions

Unattended running, operator ramp-up and delivery lead time are the three practical questions that decide whether a quoted daily output is achievable in your own factory.

Can an automated knitting machine run unattended overnight?

Most modern machines can, within limits. Stop motions, yarn break detectors and automatic take-down keep a machine running after a fault, and networked models push alarms to a phone. The real constraint is package size: a fast machine empties its cones before morning, and a full fabric roll still needs a person. A realistic lights-out window is four to six hours, with one operator covering six to ten machines at night.

How long does it take a new operator to reach rated output?

Loading, unloading and clearing basic stops take two to six weeks to learn, and most operators reach steady output within two months. Pattern programming is separate and typically takes three to six months to reach competence on complex jacquard work. Expect a 10 to 20 percent efficiency penalty in the first month of any new machine or style.

What lead time should be expected for a new knitting machine?

Standard flat and circular machines usually ship in 30 to 60 days from order confirmation, with 15 to 30 days of sea freight added for export. Commissioning takes one to three days per machine once utilities are ready, but stable efficiency takes another one to two weeks. Order spare needles with the machine, because one missing needle type can idle a line for a week.

Home
About Us

WELLKNIT was founded in Taiwan since 1987, and in 1995, we set up the production base in Quanzhou, Fujian, is the first Taiwan-funded weft knitting machine manufacturer to take root in Quanzhou.

Product Category

Contact Us

  CN: No. 189, Lu'an, Jincuo Village, Dongyuan Town, Quanzhou Taiwanese Investment Zone
  CN:0086-595-22632339
     TW:00886-3-3798292
 
market@wellknit.com.tw
    winnie@wellknit.com.tw
Subscribe
Sign up for our newsletter to receive more.
 
Copyright © 2021 Wellknit Textile Technology Co.,ltd. All rights reserved. Sitemap.